Use the Stock area to input stock items.
The input procedure is very simple and is optimized for quick data input.
|
|
To insert a new stock item press the [Insert] key while in
stock grid or click the
button from the buttons bar.
To change a field value, double click on the field to switch it to edit mode
or just type the new value and press [Enter] to validate.
The cursor will move to the next field.
Alternatively, you can edit stock details by clicking the edit button
on the left of the item name.
The Material price
defined here for a particular source length & material overwrites the material
price set in the Materials window,
for that particular source.
For ex.: if you defined a price of $10/m for the material type "Steel Pipe"
in the Materials window, this price
will be used for all sources having "Steel Pipe" as material, regardless
of their length. But, if you define a new price in the "Stock item details"
window for source length 2500 mm and material type "Steel Pipe", this
new price will be used for all 2500 mm "Steel Pipe" sources instead
of the price set in the Materials
window for the "Steel Pipe" material type.
Please note that the material list will contain only those materials that are
present in the Materials list. Smart1DCutting
manages different material sources and parts based on this field. If you don't
plan to use different material sources and parts you can leave this field empty
all the time.
Important: The best practice is to add the material type to
the Materials list and then select
it from the drop-down box for each stock item.
Even the smallest difference between 2 material strings will cause the program
to treat them as different materials. For ex.: "PVC Pipe" and "PVCPipe"
are considered different material types by the optimization engine.
Once entered, data can be modified in
the Stock list. |